Guide to Demolition (no reconstruction)
City of
Swift Current
DEMOLITION PERMITS
(PROPERTIES WHERE NO BUILDING/STRUCTURE IS TO BE RECONSTRUCTED)
Building Bylaw Requirements and
Approval Process
-
Complete a Demolition Permit Application form for the Demolition.
-
Pay all of the taxes on the building, or portion thereof.
-
Pay the $50.00 Permit Fee, and ensure the demolition is complete within 6 months from the date of permit issuance.
-
Finally, clean up the property, and disconnect the water and sewer. This is done at your own expense.
-
The city will disconnect the water and electrical meter—2 days notice is required (306-778-2731). SaskEnergy will disconnects gas meters. These services are provided at no charge. Contact SaskEnergy (306-778-4151) regarding charges for terminating gas lines at the main.
Telephone : 306-778-2714
Fax : 306-778-2194
e-mail: bldg@swiftcurrent.ca
NOTE
The issuing of a permit does not exempt the contractor/owner from compliance with any Bylaws, Statutes or Regulations that may be applicable.
A contractor/owner, which is found to contravene any Bylaw, Statute or Regulation, may have the permit revoked.
A permit shall not be deemed an endorsement by the City of Swift Current of the contractors business practices.